Relating to the interconnection process; and prescribing an effective date.
About This Bill
Latest Action · Aug 7, 2025
Chapter 471, (2025 Laws): Effective date September 26, 2025.
Session
2025R1
Introduced
Jan 13, 2025
Summary
Highlight any text to annotate
Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a microgrid or community microgrid. Allows a contracted third-party consultant to receive from a public utility all technical data necessary to conduct the study or engineering evaluation and submit to the public utility a preliminary design for review. Requires a public utility to approve or deny an application based on safety, reliability and compliance with published standards. Takes effect on the 91st day following adjournment sine die.