Nonpartisan civic infrastructure
AllCiv·Legis1
·

33 U.S.C. § 701m

U.S. CodeFederal
Insufficient Congressional authorization; preparations for and modification of project
About This Law
/us/usc/t33/s701m
Title
33 — Navigation and Navigable Waters
Chapter
CH15
Release
119-84
Release Date
2026-04-17

Section Text

Highlight any text to annotate
In any case where the total authorization for a project heretofore or hereafter authorized by Congress is not sufficient to complete plans that may have been made the Chief of Engineers is authorized in his discretion to plan and make expenditures on preparations for the project, such as the purchase of lands, easements, and rights-of-way; readjustments of roads, railroads, and other utilities; removal of towns, cemeteries, and dwellings from reservoir sites; and the construction of foundations. The Chief of Engineers is also authorized in his discretion to modify the plan for any dam or other work heretofore or hereafter authorized so that such dam or work will be smaller than originally planned with a view to completing a useful improvement within an authorization: Provided, That the smaller structure shall be located on the chosen site so that it will be feasible at some future time to enlarge the work in order to permit the full utilization of the site for all purposes of conservation such as flood control, navigation, reclamation, the development of hydroelectric power, and the abatement of pollution. (Aug. 18, 1941, ch. 377, § 2, 55 Stat. 638.)

Take Action

Your position
Add a comment
to comment on this section.
Annotate the text
Highlight any passage on the Full Text tab to attach a note. Annotations appear on the Annotations tab.