Nonpartisan civic infrastructure
AllCiv·Legis1
·

H.R. 3144

BillFederalHousePassed House
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
About This Bill
Passed
Latest Action · April 26, 2018
Received in the Senate and Read twice and referred to the Committee on Environment and Public Works.
Congress
115th (2017–2019)
Introduced
June 29, 2017
Cosponsors (8)
1D 7R
View PDF ↗

Summary

Highlight any text to annotate
(Sec. 2) This bill requires the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers to operate the Federal Columbia River Power System (FCRPS) in a manner consistent with the document titled "Endangered Species Act Section 7(a)(2) Supplemental Biological Opinion," dated January 17, 2014, until the later of September 30, 2022, or the date upon which a subsequent final biological opinion for FCRPS operations is in effect with no pending further judicial review. (Sec. 3) Such entities may amend the supplemental opinion and operate the FCRPS accordingly before such date if the entities agree that: (1) the amendments are necessary for public safety or transmission and grid reliability; or (2) the actions, operations, or other requirements that the amendments remove are no longer warranted. (Sec. 4) No structural modification, action, study, or engineering plan may restrict electrical generation at any FCRPS hydroelectric dam or limit navigation on the Snake River in Washington, Oregon, or Idaho unless authorized by Congress.

Take Action

Your position
Add a comment
to comment on this bill.
Annotate the text
Highlight any passage on the Summary or Full Text tab to attach a note. Annotations appear on the Annotations tab.