Nonpartisan civic infrastructure
AllCiv·Legis1
·

H.R. 8016

BillFederalHouseIn Committee
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
About This Bill
Committee
Congress
117th (2021–2023)
Introduced
June 9, 2022
Cosponsors (10)
0D 10R
View PDF ↗

Summary

Highlight any text to annotate
Federal Columbia River Power System Certainty Act This bill requires Federal Columbia River Power System (FCRPS) operations to be consistent with a specified decision. The system includes dams in the Columbia and Snake rivers in the Pacific Northwest. Specifically, the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers must operate the FCRPS consistent with the Columbia River System Operations Environmental Impact Statement Record of Decision dated September 2020. The preferred alternative outlined in that decision would allow specified dams in the lower Snake River to remain in place. The decision may be amended if each agency determines that (1) changes are necessary for public safety or electrical grid reliability, or (2) certain requirements in the decision are no longer necessary. Further, the bill requires statutory authorization for any structural modification, action, study, or engineering plan that (1) restricts FCRPS hydroelectric dam generation; or (2) limits navigation on the Snake River in Washington, Oregon, or Idaho.

Take Action

Your position
Add a comment
to comment on this bill.
Annotate the text
Highlight any passage on the Summary or Full Text tab to attach a note. Annotations appear on the Annotations tab.