Nonpartisan civic infrastructure
AllCiv·Legis1
·

S. 4806

BillFederalSenateIn Committee
A bill to clarify that the interconnection of large load facilities directly to facilities used for the transmission of electric energy in interstate commerce is a matter within the jurisdiction of the Federal Energy Regulatory Commission.
About This Bill
Committee
Latest Action · June 17, 2026
Read twice and referred to the Committee on Energy and Natural Resources.
Congress
119th (2025–2027)
Introduced
June 17, 2026
Cosponsors (0)
None
View PDF ↗

Summary

Highlight any text to annotate
The POWER Up Act clarifies that the Federal Energy Regulatory Commission has jurisdiction over connecting large electricity consumers directly to the nation's interstate power transmission system. A "large load facility" is defined as any facility or group of related facilities at the same or adjacent locations that demand 100 megawatts or more of electricity, though the Commission can adjust this threshold as needed to protect grid reliability. The legislation requires the Commission to create standardized procedures and agreements for these large industrial connections within 18 months of the law's enactment. The bill does not affect states' existing authority over facility siting, permits, construction, retail electric rates, local power distribution, or power generation. This measure aims to establish clear federal oversight for major industrial electricity consumers while preserving traditional state and local regulatory roles.

Take Action

Your position
Add a comment
to comment on this bill.
Annotate the text
Highlight any passage on the Summary or Full Text tab to attach a note. Annotations appear on the Annotations tab.